DCE: Major Project Work EG 3205 CE (Highway)

 Highway: [23 Hours]

3.1. Study of contour map.

3.2. Draw layout of road alignment, profile, cross-section with the help of given data/topographic

map.

3.3. Design horizontal and vertical curve.

3.4. Provide typical retraining structures, drains and culverts.

3.5. Prepare bill of quantities and cost estimate.

link to download SW ROAD:      DOWNLOAD SW ROAD

AFTER DOWNLOADING: 

  1. CREAT YOUR ACCOUNT
  2. DOWNLOAD LEARNING EDITION

Comments